Gas Pipeline Néstor Kirchner
Grupo Operadores was the company selected to carry out the international logistics of all the machinery and equipment that were part of the construction of the Nestor Kirchner Gas Pipeline. We have moved more than 100 large-scale pieces of equipment and technology from different parts of the world such as Europe, USA, Uruguay and Chile; Participating also in customs management for their release and meeting all the stipulated deadlines in record time, operating simultaneously in different customs offices in Argentina such as Buenos Aires, Ezeiza, Campana and Mendoza.
The vast majority of this machinery and tools -which entered the country temporarily- is returning to their countries of origin, which is why we are currently coordinating their transport and formality of customs exits, which involves significant logistics accuracy.
The President Nestor Kirchner Gas Pipeline is a construction that will facilitate the extraction of gas from Vaca Muerta and its distribution throughout the rest of the country, as well as its export in the future. This will generate annual savings of more than 5,000 million dollars per year in terms of substitution of fuel imports.

Reversion of the North Gas Pipeline
One more milestone in our commitment to national development!

We received at the Zárate Terminal the temporary import of thirteen (13) Caterpillar Pipelayers with their respective welders from the USA.

These equipments will be used in the Reversion of the North Gas Pipeline that will allow the transportation of gas from Vaca Muerta to the provinces of northern Argentina.

Our client – Sacde – was awarded the contract for the approximately 150 km section to be built between Río Pujio and La Carlota in the province of Córdoba.

In this opportunity we not only took care of the customs clearance, entry, dispatch and release of all the equipment, but also of the logistics and transportation of all the cargo, which includes 39 packages for a total of 510 tons.

This equipment is part of a series of machinery, accessories and additional equipment that will continue to enter the country from the USA, Uruguay and Europe.

Tunnel Boring Maldonado
Grupo Operadores has a department specialized in project cargo, carrying out the transportation of road machinery for the construction of roads, dams and gas pipelines throughout South America, as well as the transportation of special size equipment.
We have actively participated in the nationalization of the two imported tunnel boring machines for the piping of the Maldonado stream, one of the largest works carried out by the Government of the City of Buenos Aires. The large equipment arrived in Buenos Aires in more than 25 containers.
For customs purposes, we used the staggered shipment regime due to the complexity of the goods from the customs and logistic point of view, and we also transported and participated in the customs clearance process of TBM (Tunnel Boring Machine).
FAdeA
Argentina Aircraft Factory “Brig. San Martin” S.A (FAdeA) – Import of aircraft, spare parts and supplies.

Our office is located inside the factory, allowing us to actively participate in the whole logistic process, up to the coordination of the already nationalized cargoes.

Among the most outstanding works with our client, we can mention the import of tooling and other assemblies for the Embraer KC-390 aircraft. Import of spare parts and supplies for the modernization of PAMPA IA-63 block III, HERCULES C-130, recovery and modernization of AB-206 helicopters, all belonging to the FAA, among others.

FAdeA performs both military and commercial MRO tasks. This allows us to work together with Cordoba Customs since 2019 until today in the import and export of 52 aircraft.

With more than 15 years working together with our client with commitment and responsibility, Grupo Operadores provides a reliable service in the aeronautical field